THE DOWNHILL carriageway of Mucklow Hill, between B&Q roundabout and the entrance to Leasowes Park, is reduced to one lane.

The reduction, between 9.30am and 3.30pm, is to allow repair work to be carried out to the bridge parapet.

Work should be completed by Friday (October 16).

Some delays are anticipated and drivers should proceed with caution and seek and alternative routes if possible.